
7
1.3. NuStreams-P9M Panel Functions Overview
NuStreams-P9M’s LEDs, buttons, and interface ports are located on its Front, Left and Right Side
Panels.
Front Panel
System Status & Testing Result Feedback Interface
LCD
4 x 20 characters LCD that display system information, status, and menu
System
¾ Power: Power ON ¾ SYS: System ready ¾ USB: USB connection status
¾ Link/Act: Connected with DUT WAN port ¾ 10M: 10 Mbps connection linked ¾ 100M: 100 Mbps connection linked
WAN
¾ Static IP: Using static IP as router WAN
connection
¾ DHCP: Using DHCP as router
WAN connection
Test
¾ Pass: DUT passes the test ¾ Fail: DUT does not pass the test
¾ || Pause: Pause current running test ¾ ► Run 2: Test Task of Run 2 is running
Hotkey
¾ ► Run 1: Test Task of Run 1 is running ¾ ► Run 3: Test Task of Run 3 is running
LAN Link/ACT
NuStreams-P9M’s LAN ports are connected to DUT’s (switch or router) LAN ports. LAN LED 0~7 will be on accordingly
LEDs
STEP
NuStreams-P9M’s testing process includes 4 steps. STEP LED 1~4 will show the testing process accordingly
Configuration Buttons (Left Side) Operation Buttons (Right Side)
Enter main menu, return to the previous menu, or cancel the
changes you’ve made
|| Pause Pause the test that is currently running
▲/+
Move selection cursor up or change test parameters
► Run1
Start Run 1 test. Up to 4 tasks can be configured in each Run
hotkey. Press this button and all tasks stored within will start
▼/-
Move selection cursor down or change test parameters
► Run2 2
nd
hotkey as above
Enter selected menu or apply the changes you made
► Run3 3
rd
hotkey as above
Note: For more information regarding to NuStreams-P9M’s LED status, please refer to “1.4. NuStreams-P9M LED Status”.
XTRAMUS TECHNOLOGIES
Website: www.Xtramus.com
Komentáře k této Příručce